Technical equipment / system index
Additional information
Because there is no quay wall, our 8 t slewing/level luffing crane is positioned on a crane bridge with tracks, which extends approx. 40 m into the Reiherstieg. Seagoing vessels up to 110 m in length moor in front of the crane bridge; inland navigation vessels with a maximum width of 9.50 m and 100 m length moor parallel to the seagoing vessel under the crane bridge.
The Louis Hagel complex does not have a quay wall. Thanks to an innovation we have been able to transform this disadvantage into a competitive advantage: Our loader is not fixed in the water but situated on a specially constructed pontoon, where it can be moved over a length of 104 m.